September 26, 2017

Part 3 - Tips on creating and implementing an addendum

Introduction

Welcome to part three of the article on addendums. It covers a few tips on creating and implementing an addendum in your organization. How to implement an addendum is just as important as the creation process.

Three types of tips for creating an addendum

This section covers a few tips on creating an addendum. The tips are divided into three parts; useful information, tips for creation, and typical pitfalls to avoid.

1. Useful information for creating an addendum

The list below contains an example of useful information for creating an addendum. All of the items may not apply to your organization.

  • check
    Discourage the use of "extension of principles" beyond coverage of Y14.5 and your addendum on drawings.
  • check
    List the specific standard(s) that are used as a base for your addendum. Include the name and version of each base standard.
  • check
    Provide guidance on how to handle legacy design data with outdated, incomplete, or no GD&T.
  • check
    Include a list of temporary CAD workarounds for areas where your CAD software does not have the new symbols from the latest version of the standard.
  • check
    Include a list of approved template drawings for typical applications.
  • check
    Include a list of quality assurance and metrology standards and practices used in your company
  • check
    Include tips on how to apply tolerances to a drawing. (for example, position tolerances can only be applied to features of size. Rule #1 only applies to individual regular features of size. Also include other tips as needed.)
  • check
    Review the addendum annually to consider and changes requested.
  • check
    Check with your legal department to ensure the addendum is worded correctly and does not cause any legal issues.

2. Tips for creating an addendum

The list below contains an example of useful information for creating an addendum. All of the items may not apply to your organization.

  • check
    Make a presentation to management to get support for the addendum project. The presentation should include: why an addendum is needed, how the addendum will benefit your company's business goals, who are the key stakeholders, and what is involved in creating and implementing the addendum.
  • check
    Create a scope for your addendum. List the topics and base standards that you will include.
  • check
    During the creation process, assemble an addendum team. Involve representatives from all key stakeholders. Typically, the stakeholders include product engineering, supplier quality, metrology, manufacturing engineering, and purchasing.
  • check
    Make the addendum a corporate wide document If necessary, create separate sections for different divisions or locations that have unique needs..
  • check
    Make the addendum an official corporate document (e.g. engineering standard or similar type document.) in your organization with change control and a formal approval process.
  • check
    Include a Y14.5 / ISO standards expert on your addendum team to ensure the addendum is in harmony with the ASME and ISO GPS standards.
  • check
    Add a sentence to your addendum to inform the reader where to send issues, changes, and suggestions.
  • check
    include tips on how to apply tolerances to a drawing. (for example, position tolerances can only be applied to features of size. Rule #1 only applies to individual regular features of size. Also include other tips as needed.)

3. Common addendum pitfalls to avoid. 

The list below contains common addendum pitfall . All of the items may not apply to your organization.

  • check
    Repeating sections of the standard.
  • check
    Using different terminology than in the standard
  • check
    Changing the interpretation of the standard without clearly defining the new interpretation.
  • check
    Forcing the use of the Y14.5 standard on applications where "better" standards exist. (e.g. ISO 10315 Edge Definitions.)
  • check
    Creating new tolerancing tools or methods for applications when tools already exist in the Y14.5 standard.

Tips for implementing an addendum

This section covers a few tips on implementing an addendum. The tips include approvals/buy-in, distribution, and training. All of these tips may not apply to your organization.

  • check
    Require each drawing to have the addendum number in the notes section of the drawing.
  • check
    Develop an internal training program for the addendum and make required for all drawing users.
  • check
    Publish a corporate wide "Notice of Publication" for the addendum.
  • check
    If your addendum changes the interpretation of the Y14.5 standard, distribute it to all of your suppliers. This will help to ensure they have all the information needed to interpret your drawings.
  • check
    Make the addendum available for the public to purchase through a third=party company like Global IHS.

Summary and closing thoughts

Hopefully, some insights were gained with this brief look at addendums. As you may have noticed, I am an advocate of using addendums in large corporations. Developing an addendum renews the focus on the importance of drawings.

In a survey I conducted, I found that about 30% of the companies in the survey use addendums (or some sort of supplement to the Y14.5 standard), and about 15% mentioned that they felt an addendum would be useful in their company.

NOTE:

If you would like to see an example of an addendum, you can purchase a copy of the GM addendum by clicking the button below.

 

Does your company use an addendum? Do you have any suggestions for items that should be in a Y14.5 standard addendum? If so, add a comment below.

If you would like assistance in creating a corporate addendum, contact me at Alex@KrulikowskiConsulting.com 

About the author 

Alex Krulikowski

​Author of 22 books on GD&T, teacher, mentor, instructional designer, ASME and ISO standards member, product designer, dimensional engineering manager, speaker, and successful entrepreneur.

Leave a Reply

Your email address will not be published. Required fields are marked

  1. Thank Alex,
    These 3 parts bring good tips and bring ASME Y14.5 users to an other level of understanding and application to meet system functional and customer requirements

{"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}

Avoid costly mistakes by using the Rule #1 cheat sheet.

Get our cheat sheet and have a quick way to remember GD&T facts.

You will also receive email notices when new articles are published in our GD&T blog.

Success message!
Warning message!
Error message!